Projects
Andover College
Carry out cabling works to the new health and hair suite, including 250 no new cat5e data point new communications room and fibre optic links.
Morecrofts for The Central Library Nottingham
To undertake a full refurbish program working alongside morecrofts over 3 months to bring the Library into the 21 st century, this work includes voice and data works.
ASG Group Ltd
To aid with the expansion of an ever growing company, we have under taken the contract to provide them with the most up to date Mitel phone system, projector and smart board installation into the board room, and door access system.
The Phoenix Hospital Group
Network infrastructure upgrade, new dell switch installation to aid with the running of a busy hospital network.
Whitegates
New floor to floor data links enabling out I .T department to relocate the servers into the first floor office.
Sparsholt College Hampshire
Offering them our full support to cover all aspects of network coverage and installations, from building to building laser links cab upgrades, and new fibre optic network links.
BMI Healthcare
Carrying out a full infrastructure support over 65 hospitals inc voice and data installations.
Derby High School
The supply and Installation of Interactive Smartboards and Sanyo Projectors into their new Sixth Form building, Common Room and Library.
The installation of cat5e network points for the new IT suite including Projector in the Lower School Building.
Various other data and projector installs/re-positions also took place throughout the school year.
Derby College
The supply and installation of 2x external fibre optic cables to the Equine Centre and Pet Grooming. As part of the installation Orchid had to organize the digging out, laying of containment to both locations. Approx 800m worth of ground works were completed.
Both fibres were then terminated and tested.
Cardinal Square
The Installation of 750x cat5e network points across 4 floors, including power sockets, network cabinets on each floor and copper links back to the main comms room on the ground floor. The whole installation was completed in 2 weeks as the client needed access more or less straight away.
Both power and data fully tested and warranties issued.